Welcome to
PT KABELINDO MURNI Tbk.
Successfully Supporting Indonesia's Best Infrastructures
Get StartedCatalogue
Projects

POWER GENERATION 35,000 MW
Reconducting 150 kV Transmission Metro – Tegineneng from ACSR to ACCC Amsterdam Powered by Kabelindo's Bare Conductor Supported PT Arjuna Mas Abadi

PLN 35,000 MW ACCC INSTALLATION
The Installation of 150.6mm^2 ACCC Helsinki size conductor to span the Banda Sea from Baruta, Muna Island to Bau-Bau, Buton Island Powered by Kabelindo's Bare Conductor Supported PT Kelinci Mas Unggul

PERTAMINA BALONGAN PROJECT
Powered by Kabelindo's Medium Voltage Power Cables and Control Cables, and Instruments Cables Supported PT Pertamina.

RFCC PERTAMINA PROJECT
Powered by Kabelindo's Control Cables and Instrument Cables Supported PT Adhi Karya (Persero) Tbk

PAITON PROBOLINGGO
Installation of ACCC for PT Kabelindo Murni Tbk Paiton Tower Relocation Project, Probolinggo

COAL BOILER PUPUK KALTIM PROJECT
Powered by Kabelindo’s Control Cables, and Instrument Cables Supported PT IKPT

Values
Transparency
Every Kabelindo personnel always thinks positively in delivering or receiving any information, suggestions and criticism as well as seeks correct and effective two-ways communication for the common advantage and benefits.
Unity
In life human beings shall grow together and complement each other. Every Kabelindo personnel interacting with each other shall uphold the dignity, prestige, solidarity, and mutual respect, while assisting each other at work.
Integrity
In implementing the work, every Kabelindo personnel must be with good faith, hearty, sincere, honest, responsible, respectful, and dedicated to the company, follow employees, shareholders, and society, as well as respecting the customers and the business partners.
Added Value
Every Kabelindo personnel continues to provide a positive contribution in any work done to satisfy the interests of customers, internal and external that generate more value for all parties.